1
/
of
6
Trusted Home Store
Wanwaytech Wireless 4G GPS Tracker With Real-Time Location Monitoring
Wanwaytech Wireless 4G GPS Tracker With Real-Time Location Monitoring
Regular price
$38.99 USD
Regular price
$0.00 USD
Sale price
$38.99 USD
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Secure your vehicles and valuable assets today with the Wanwaytech S20, a wireless 4G GPS tracker delivering real-time location monitoring through the dedicated TrackerOne application.
- Charge the built-in 7500mAh rechargeable battery to support up to 30 days of standby operation in power-saving mode for continuous monitoring.
- Create unique geofencing boundaries immediately to trigger instant notifications whenever your vehicle leaves or enters predefined safe zones remotely.
- Access complete travel histories directly via the software, reviewing up to 270 days of precise movement data for your own logistics planning.
- Discreetly mount this unit measuring 3.74 by 2.83 by 1.38 inches within your vehicle while reliably relying on 5V power inputs always.
Share
